Tuesday 19 March 2013

In-Class Spaghetti Challenge


We had to construct a structure out of raw spaghetti pasta and masking tape that would fit in a 100mm x 100mm x100mm cube. The Aim of the challenge was to have the structure to be very sturdy and that it could withstand weight as well as an applied pressure from the top.

First Structure Created:
we decided to go with a larger triangular base and a smaller triangular top but there was no strength in the center due to no cross bracing and supports.




Second Structure Created:

we decided to use triangles to create the structure more sturdy then the first attempt. also cross bracing was used in diagonal angles to allow for more strength.




No comments:

Post a Comment